German Electricity Market in 2017 – records for battery storage and redispatch

Like this post? Let us and others know by sharing it!
Fotolia_111513186_S.jpg

Recently, Tennet, the Dutch transmission system operator which is responsible for a significant part of the German transmission system, published its report on the developments in the electricity market in Germany and the Netherlands in 2017.  Within the following we will briefly summarize the key findings of the report for Germany. If you are interested into the full picture, you can find the full report here

Wholesale prices on the rise in 2017 

We have already discussed here on enerquire that wholesale prices are under pressure from increasing shares of renewable electricity supply. In 2016, monthly average day-ahead prices in Germany fluctuated between 30 €/MWh and 20 €/MWh most of the time (from January to September 2016). In comparison, the same prices stayed above 30€/MWh in 10 out of 12 months in 2017.  Figure 1 quite nicely illustrates that prices in the Central Western European  bidding zone (CWE) have recovered accordingly, with an yearly average in 2017 above the level of 2015. 

Figure 1: Monthly average of hourly day-ahead wholesale prices in the CWE region (TenneT 2018)

Figure 1: Monthly average of hourly day-ahead wholesale prices in the CWE region (TenneT 2018)

Additionally, we can learn from figure 1 that Germany (which is sharing a bidding zone with Austria till October 2018) has the lowest wholesale prices in the CWE. Especially in France and Belgium the monthly average prices differ more significantly between winter and summer season (due to electrical heating)  than they do in Germany and the Netherlands. 

From Day-Ahead towards Intra-Day-Trading

There is an ongoing trend in electricity trading which is directly linked to renewable generation: The trading volume on the day-ahead market especially in the German/Austrian bidding zone is decreasing (See figure 2), while intra-day trading volumes are increasing (see figure 3). The mechanism behind this movement is quite straight forward: Predicting renewable generation 24hrs in advance is still rather imprecise. As a result, electricity from renewables is usually traded close to delivery when production can be predicted more accurately.  

Figure 2: Annual trading volumes at day-ahead exchanges (Telnet 2018)

Figure 2: Annual trading volumes at day-ahead exchanges (Telnet 2018)

Figure 3: Intra-day trading volumes in Germany/Austria and in the Netherlands from 2015-2017 (TenneT 2018)

Figure 3: Intra-day trading volumes in Germany/Austria and in the Netherlands from 2015-2017 (TenneT 2018)

Figure 3 depicts that the annual trading volume on the intra-day market in Germany/Austria has increased by more than 50% from 2016 to 2017 (ID EPEX auction in figure 3), while the hourly trading volume has increased by roughly 20% (ID EPEX hourly). Still, intra-day trading for the German/Austrian bidding zone adds up to only 20% of the volume that is traded one day ahead for the same bidding zone. Compared to the Netherlands, the intra-day-volume in Germany/Austria is quite significant. There are several drivers behind the increasing intra-day-trading in Germany. Most prominently, the TSOs in Germany are obliged to sell all renewable generation in the day-ahead or intraday-market. 

The German/Austrian bidding zone split

In October 2018, Germany and Austria will become two separated bidding zones. The current futures base load contracts (which are contracts that focus on long-term delivery, e.g. for the next 12 or 24 month and are often use for base-load power) for Germany and Austria 2018 and 2019 show that while prices are likely to decrease in Germany compared to the futures of the current German/Austrian bidding zone, prices in Austria will potentially increase after the split. Primarily, these price developments are driven by the larger market in Germany and different support schemes for renewable electricity supply. Figure 4 summarizes the price spread of base load contracts valid from fall 2018 onwards between the new bidding zones of Germany and Austria compared with the current joined bidding zone Germany/Austria. 

Figure 4: Price spread between different baseload futures for Germany and Austria (TenneT 2018)

Figure 4: Price spread between different baseload futures for Germany and Austria (TenneT 2018)

Base load power plants under pressure from rising fuel costs

It is old news that the margins of conventional power generators have become smaller in Germany over the last 5 years. However, in 2017, the German power generation market faced some significant changes in the market environment. Most prominently, prices for gas and especially for hard coal increased significantly. Though the average natural gas price increased by 20% from 2016 to 2017, the price level is still below the prices from 2015, which was a very unprofitable year for gas-fired power plants in Germany. Even more interestingly, the annual average prices for hard coal have jumped by 40% in 2017 compared to the prices in 2015 and 2016. This price increase for coal was mainly driven by Chinese coal policy in 2017, which reduced global supply significantly. Though wholesale prices in Germany increased in 2017, the income for generators did not rise enough to compensate the increasing operation costs of conventional power plants, at least at base load. 

The increasing fuel-costs resulted in very low base-load spreads (the difference between the marginal costs of the power plants plus the CO2 prices and the wholesale electricity prices) for base-load coal power plants, which faced low spreads only slightly above 0 €/MWh from February till November 2017. For base-load gas-fired power plants the situation was even worse, with spreads below 0€/MWh from February 2017 throughout the whole year. Gas-fired peak-power plants, on the other hand, remained profitable with higher spread in 2017 than in 2015 and 2016. Figure 5 summarizes the Clean Dark Spread Base (relevant for hard coal power plants) and the Clean Spark Spread Base and Peak (base for gas-fired power plants in baseload, peak for gas-fired power plants in peak load) from 2015 till 2017. 

Figure 5: Monthly average clean dark spread base and clean spark spread base/peak in Germany/ Austria (Tennet 2018)

Figure 5: Monthly average clean dark spread base and clean spark spread base/peak in Germany/ Austria (Tennet 2018)

Utility Scale Battery Storage in Germany – significant growth, but still on a very small level

Utility scale battery storage is still the exception in Germany. While the residential and industrial battery storage market is developing quite fast in Germany, utility scale battery storages only add up to about 230 MW in 2017. Still, compared to 2016, this capacity has nearly doubled and further utility scale battery storage projects will be realized in 2018 (e.g. two large battery storages are currently built in Northern Germany: a lithium-ion system 7.5MW/2.5MWh plus a sodium-sulfur unit 4.4MW/20MWh (renews.biz 2018))

Figure 6: Installed capacity of utility-scale battery and power-to-gas storage technologies in Germany (TenneT 2018)

Figure 6: Installed capacity of utility-scale battery and power-to-gas storage technologies in Germany (TenneT 2018)

Renewable Generation in Germany 

Renewable generation is still on the rise in Germany, even though at a much lower pace than in the years around 2010. Due to favorable weather conditions, renewable generation provided 38% (33% in 2016) to total electricity generation in Germany in 2017. Figure 7 illustrates that especially the very windy last quarter of 2017, as well as the significant electricity production from photovoltaics in the summer of the same year (with a new record in June) were the primary drivers for the increase in total electricity production by renewables. 

igure 7: Monthly feed-in of RES in Germany (TenneT 2018)

igure 7: Monthly feed-in of RES in Germany (TenneT 2018)

The costs of the Feed-In Tariff (EEG) are stagnating – first tenders successful

In Germany, the costs for the feed-in tariff scheme are covered by a surcharge to the consumption of each kWh of electricity. While this surcharge is still on a very high level being slightly below 7€cent/kWh, it has remained rather constant compared to 2016 (it has even decreased a little bit). Figure 8 illustrates how the different tariffs for different renewables developed on average from 2010 till 2017 and compares this to the EEG surcharge (levy) which is paid for by the consumers to cover the costs of the tariffs. 

Figure 8: Average feed-in tariff (left axis) and EEG levy (right axis) (Tennet 2018)

Figure 8: Average feed-in tariff (left axis) and EEG levy (right axis) (Tennet 2018)

Especially the subsidies for PV-power plants are decreasing significantly and thereby reduce the pressure on the EEG surcharge. Furthermore, the subsidy-scheme in Germany is currently in a transition period from governmental defined feed-in tariffs towards tendering systems. Figure 9 shows the different results of the tenders in Germany for large photovoltaic-power plants and onshore wind farms. 

Figure 9: Average auction results for solar panels and wind onshore turbines in Germany (Tennet 2018)

Figure 9: Average auction results for solar panels and wind onshore turbines in Germany (Tennet 2018)

Both solar PV and onshore wind farms participating in the tenders required a subsidy below 7 €ct/KWh or even less in 2017. Similar developments can be observed for offshore windfarms in Germany (see figure 10). 

Figure 10: Strike prices of offshore wind auctions (TenneT 2018)

Figure 10: Strike prices of offshore wind auctions (TenneT 2018)

Note that the strike prices shown in figure 10 are not directly comparable between the different states, since different rules for the network connections apply etc. Still, the first result of the offshore tender in Germany reached a very low level as well. 

Redispatch costs in Germany reach new record in 2017 – far above 1 billion €

Network congestion has been one of the key topics for network operators in Germany for quite a while now. With increasing shares of renewables and intensifying cross-border trading the situation gets more complex from year to year. In a previous post (which you can find here) we have already introduced the processes behind redispatch and the resulting costs for the system in the period from 2014 till 2016. In 2015, the total costs of redispatch in Germany for all TSOs added up to more than 1 billion €, which was quite significant at that time. While in 2016 redispatch costs were lower, mainly due to weather conditions, they reached a new record in 2017. Even though the numbers are not yet published for all TSOs, the redispatch coasts of TenneT alone indicate that redispatch costs have reached a new maximum in 2017 in Germany. In 2017, TenneT alone had to pay more than 1 billion € for redispatch. 

Figure 11: Redispatch costs in the TenneT control area between 2015 and 2017 (Tennet 2018)

Figure 11: Redispatch costs in the TenneT control area between 2015 and 2017 (Tennet 2018)

2017 - a year of records in the German electricity system

The data collected by TenneT points at several very important aspects of the German electricity market in 2017. While wholesale prices increased, power plant operators (especially those focusing on base load) were facing decreasing revenues close or below zero. Renewable generation increased again, while the renewable surcharge remained stable. The first tenders for renewable generation reached low subsidy-levels below 7€cent/kWh and the market utility-scale battery storage seemed to take-off, but remains a rather small market for now. From the network operators’ perspective the most significant development in 2017 was the increasing need for redispatch in Germany, which lead to costs of more than 1 billion for TenneT alone. What can we expect from 2018? So far, German renewable generation in the first quarter of 2018 has exceeded renewable production in the same period in 2017 by 18%. A first hint for another year of records to come? 

Like this post? Let us and others know by sharing it!